RC Truck and Construction

RC Truck and Construction (https://www.rctruckandconstruction.com/index.php)
-   Construction Equipment (https://www.rctruckandconstruction.com/forumdisplay.php?f=6)
-   -   Perry's Leimbach Build (https://www.rctruckandconstruction.com/showthread.php?t=331)

Texasperry 09-19-2010 05:44 PM

Re: Perry's Leimbach Build
 
Did some work running hydraulic lines today. I removed the valve block to move it back as Joe suggested. Also to relocate the aux. valve. I was not succesfull in removing the hoses from the valve block without damaging the hoses. I hope I have enough hose to finish the machine. I had to order some drills and taps to complete the valve block move as well.
Joe do you run two battery Packs or a modified battery pack.
Perry

Lil Giants 09-23-2010 12:46 AM

Re: Perry's Leimbach Build
 
I use two seperate 2700mAh AA packs, laying on their side - stacked up. The batt that runs the pump is always on top b/c I'll change that one 3 or 4 times to the other one that runs the rest of the model electrics.

You can't remove the hoses from the barb fitting, trim the hose with a sharp blade as close to the fitting as possible, if you ever need to remove. Then you'll have to cut the rubber hose that remains on the fitting.

Texasperry 09-23-2010 12:42 PM

Re: Perry's Leimbach Build
 
Thanks Joe, I discovered that I can not remove the hose. I had to do exactly as you mentioned.


All times are GMT -4. The time now is 01:02 AM.

Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.