Re: THE MOTHER EXCAVATOR 700
hi Rimrock.
thanks for your question.
normally i am very very clear about a detail, performance and time to built.
because i know what mean wait something for a long time.
in this case this is for me an hobby not a work and i know how many time i need for construction.
normally i take 6/7 months.
for the same reason i know how many parts i can do in a year and after this number i stopped the production.
is not a mass production. i prefere less parts but with good quality.
thanks paolo
|