Step 2: Figure out how to connect the linear actuators to make the boom and bucket work properly. I started by cutting and drilling a hole at the bottom of the boom chassis.
The cut was required to gain the proper clearance and the hole was drilled to push a brass rod through to connect one end of the actuators
From there I drilled a hole through the booms to connect the other end of the actuators
The bucket ram was easy to install, I just drilled a hole through the existing mounts