View Single Post
  #1  
Old 01-12-2014, 11:08 AM
D8R D8R is offline
Apprentice
 
Join Date: Sep 2010
Location: Ronninge, south of Stockholm, Sweden
Posts: 425
D8R is on a distinguished road
Default Modular railroad in HO

For some years now, I have been building a big dozer. Before that I was active building a home layout based from pictures taken in Modesto CA some 20 years ago.
A friend has always tried to push me for starting all over again, last summer I finaly gave in and started this time to build some modules on same prototype. We are a group building our own parts but with a common interface, they can be connected to a bigger railroad.
Bellow you can see a couple of pics from those first 3 modules, Modesto 9th street, when TS/WP/UP still runned daily trains in middle of street. All houses are scratch built based on pictures taken on location.

9th street with TS train going north


Crossing 9th street and D street


There will eventually be 7 modules (friend building 3) plus my model of Tuolumne River Bridge and an extra module to the south.
/Dan
Reply With Quote