I'll try and include some more machining processes if ya want. I think I have these hydraulic seals figured out. Trying to figure the tolerances for the x rings so they are compressed some but not too much was a bit of trial n error. This is the lift cylinders done. I still have to install a set screw for the retaining pin on the side of machine. I think I'll do it on the inside so it wouldn't be noticeable.
The lift cylinders and the blade dump cylinders (tilt I guess)
And some extra parts I guess
. Had some learning curves. Don't mink with the aluminum but brass starts to get expensive. Not to mention the pile of chips