A little update of what I've been up to. I cut out the tool/equipment/lounging bay rear door frame then cut out a ceiling and drilled holes for some interior lighting. I finished up getting the floor situated and painted. Next I moved onto the first tool box/storage unit. There's still a lot to be done in that area.