Re: 1/16 Bucyrus-Monighan Walking Dragline
Eef, I want to get these done. I want to move on to other things on the boom. Pretty boring on the milling operation. It takes 9min.ea to drill the 6 holes and pocket the spokes for the 24pcs. This evening I'm going to program the other side.Probably take close to 15min. each. I could probably go faster but risk breaking my 3/32''carbide endmill. I still need 6 more sheaves that are different size.
Lorenzo, I made each one on my lathe manually:bore,groove,part off, face to thickness.
|