View Single Post
  #140  
Old 08-14-2016, 03:56 PM
SteinHDan SteinHDan is offline
Green Horn
 
Join Date: Sep 2015
Location: Oslo, Norway
Posts: 188
SteinHDan is on a distinguished road
Default Re: 90 ton 1/14 metal excavator scratch build w/embedded PC

I made a somewhat improved snap-in hinge pin assembly. I should have used some longer bolts, but I didn't find any.

The assembly consists of two M3 20mm bolts, one compression spring and an aluminum tube to hold it straight:






The hinge pins are then snapping into the holes in the sides of the lid opening in the body:

Reply With Quote