View Single Post
  #20  
Old 01-15-2016, 07:09 AM
Rimrock Rimrock is offline
Wannabe
 
Join Date: Jul 2013
Location: Western NO
Posts: 355
Rimrock is on a distinguished road
Default Re: THE MOTHER EXCAVATOR 700

Quote:
Originally Posted by paolo84verona View Post
hi Rimrock.
thanks for your question.
normally i am very very clear about a detail, performance and time to built.
because i know what mean wait something for a long time.

in this case this is for me an hobby not a work and i know how many time i need for construction.
normally i take 6/7 months.
for the same reason i know how many parts i can do in a year and after this number i stopped the production.
is not a mass production. i prefere less parts but with good quality.
thanks paolo
Great, thumbs up) Seeing the well though of construction details and solutions, I'm pretty sure the you/designer/fabricator is in full control about the whole process
Reply With Quote