yea but very rough , when we poured it had to be 1 of the hottest days
the load came hot to begin with coupled with dry hot stones at 2 " rat slab it was all my dad and I could do to get it raked out . the ledge in the pic is half the base for the fireplace + a cap on the buttress wall. the ground here is tight close to your clays but put sand stone rocks in it . in the dry spell , it takes some time to scratch through with the 307 cat excavator I had . We hit ledge in the north east corner (straight back under the pumbing ) I'm just not sure I want to knowing whats under there . It'll sure be some model engineering fun