View Single Post
  #35  
Old 11-23-2015, 04:45 PM
SteinHDan SteinHDan is offline
Green Horn
 
Join Date: Sep 2015
Location: Oslo, Norway
Posts: 188
SteinHDan is on a distinguished road
Default Re: 90 ton 1/14 metal excavator scratch build w/embedded PC

Stepping back a few steps and mounting the new slip ring, adding PTFE protective tubing to the drive motor wires and mounting the angle bars that hold the upper structure in place.

The PTFE teflon tubing is this one:
- http://www.ebay.com/itm/111392849268





Reply With Quote