View Single Post
  #29  
Old 11-07-2021, 07:10 PM
kerst's Avatar
kerst kerst is offline
Apprentice
 
Join Date: Oct 2010
Location: NY
Posts: 471
kerst is on a distinguished road
Default Re: Krupp 180GMT 1/20

The rebuilding is complete!
After I rearranged the carrier and made all functions (except for the outriggers) RC controllable, I started work on the upper.
I was never happy with the upper and I decided to take all the motors out and replace them with new ones. I also changed the telescoping mechanism and installed the motor and spindle in the boom. That is a great improvement. The hoist also uses a spindle, but a better one than the old one. The counterweight has a motor inside and this way it can attach itself to the upper. All together there are 6 functions. Since I have only 4 feeds I had to add 2 switches on the upper.
With all these changes I gained a lot of space and there was ample space for a battery for the carrier. It connects with a plugin cable.
With all this rebuilding I tried not change the parts that worked well. I am pretty happy with the result, although some painting is needed,

The motor compartment of the truck:


The new swing motor and the 2 motors for the winches.


The boom hoist


Here a comparison of the old and the new.


The other side. Lots of electric connectors. The battery is connected via this little storage box next to the hoist cylinder.


Kerst
Reply With Quote