View Single Post
  #98  
Old 04-30-2016, 03:52 PM
SteinHDan SteinHDan is offline
Green Horn
 
Join Date: Sep 2015
Location: Oslo, Norway
Posts: 188
SteinHDan is on a distinguished road
Default Re: 90 ton 1/14 metal excavator scratch build w/embedded PC

Bolting together the arm

The arm sandwich of 3mm aluminum sheets with 3D-printed ABS in the middle is held together by 34 M4 countersunk stainless steel bolts and sleeve nuts.

There are different length bolts used throughout the arm:
- 23 x 50mm (for the main part)
- 5 x 75mm (80mm cut to length) for the stick hub
- 4 x 80mm for the stick mount
- 2 x 55mm for the stick angle sensor mount

Ebay links:
- Bolts: http://www.ebay.com/itm/231787670429
- Sleeve nuts: http://www.ebay.com/itm/191771467782



Reply With Quote