Re: Jobs Projects n Site Ideas
My original dig site was removing a backyard koi pond. Now that has become an open pit mine. Future plans are to remove a 36" old tree stump. It has been cut down about 3 years ago and some backyard root rot was drilled into stump. I have to extend fence to be able to make it a full fledged dig site. I imagine this project will take most of this summer. I figure most of the hair roots and some of the finger roots are rotten enough to dig, if not I'll have some snips around when enough dirt is removed. I think the complete dig site will be about a ten foot circle and might go down 2 1/2 - 3'. Depending on soil, it should be a sandy based soil like most around here. That should keep me busy for a while.
__________________
Always wasting money, as the wife says. To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.
|