Got alittle done this weekend on the boom suspension ropes. Not much because I'm getting parts ready to go to the sand blaster for my antique road grader restoration.
I had to drill the "A" frame sheave shafts at a 3deg angle so they will track inline with the boom taper to the point.
The shafts for the point sheaves
I didn't have any 3/8'' hex stock handy,so I milled some round stock to suit.