View Single Post
  #203  
Old 05-27-2013, 05:23 PM
mpe's Avatar
mpe mpe is offline
Green Horn
 
Join Date: Oct 2010
Location: Northern California
Posts: 188
mpe is on a distinguished road
Default Re: MPE – 24M Motor Grader Build

This pictures shows the bearings and connector pin as it sits in the rear frame. The neck will get sandwiched inbetween the bearings plates and bolted in place with 12 M2 x 12mm shcs that clamp the bearing assembly and 3 M2 x 6mm shcs that bolt the flange part of the bearing plate to the neck. The connector pin is held in place by 8 M2 x 8 shcs.
Once the neck is attached to the rear frame it will be very hard to see these features.
Reply With Quote