View Single Post
  #8  
Old 04-06-2015, 01:22 PM
JDH429's Avatar
JDH429 JDH429 is offline
Wannabe
 
Join Date: Feb 2013
Location: Cleveland
Posts: 394
JDH429 is on a distinguished road
Default Re: Jobs Projects n Site Ideas

Quote:
Originally Posted by Cooper View Post
My original dig site was removing a backyard koi pond. Now that has become an open pit mine. Future plans are to remove a 36" old tree stump. It has been cut down about 3 years ago and some backyard root rot was drilled into stump. I have to extend fence to be able to make it a full fledged dig site. I imagine this project will take most of this summer. I figure most of the hair roots and some of the finger roots are rotten enough to dig, if not I'll have some snips around when enough dirt is removed. I think the complete dig site will be about a ten foot circle and might go down 2 1/2 - 3'. Depending on soil, it should be a sandy based soil like most around here. That should keep me busy for a while.
That sounds like a project for sure, Do you think there will be any issue with water standing in the bottom of the pit? Could be like an abandoned quarry that hit a spring. Haha. Do you plan to spiral the haul road down the hole? Maybe 2-3' you might get away with a straight ramp in and out, but that may not be as fun.
__________________
Jason
Reply With Quote