Well, I finally got the tip soldered together. Another milestone crossed. I counted 135pcs that were made for this section of boom excluding about 150 bolts. I hope to get on the safety rope mountings soon. There's also a set of deflection sheaves that help guide the hoist rope I talked about before that are made but I need to design the channels that they mount to.
End Plates
Underside
Inside of the rear pillow block
Soldered
Last of the lattice that needed installed
Top section