Some more progress:
Front axle and steering mounted and working. I had to notch the frame for the servo ball connection so it could move to the right at 45 degrees:
Rear axle Locker servos mounted and connected, minor frame notches to clear the servo travel here as well. I have decided not to servo control the front locker, but it can be added later if I need it.
Tight squeeze, but the driveshaft clears the locker servos with a little room to spare:
Also the power switch and charge jack mounted. Reg has finished my dump box and it's now at the powder coaters, so hopefully I'll have it in a week or two.
Thanks again Reg, you have done an outstanding job on my dump box design and I would not hesitate one second in recommending you to anyone needing any fabrication work or a custom body built.
John