RC Truck and Construction  

Go Back   RC Truck and Construction > RC Truck's Ag and Industrial Equipment and Buildings > Construction Equipment > Construction Companies & Worksites


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 10-29-2014, 05:03 PM
Cooper's Avatar
Cooper Cooper is offline
Big Dawg On The Bone
 
Join Date: Oct 2013
Location: Watsontown, Pa
Posts: 2,119
Cooper is on a distinguished road
Default Re: Great Dane excavating co.

Humm, I will have to think a bit, five skidsteer buckets, two back hoe buckets, then the countless hours moving the same material around in the backyard pit. I would be guessing that I've got at least 40-50 hours on it. But my wife said I was crazy, I have a lot more than that. She said I had about four hours a week on it on average, 30 weeks that's about 120 hours. Man time flies by when you are havin fun. !!!!! She may be a lot more accurate than I had originally thought, quite a bit of time pushin dirt at our Riverlot during the weekends too.
__________________
Always wasting money, as the wife says.
To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.
Reply With Quote
 


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 04:14 PM.


Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.