![]() |
#11
|
|||
|
|||
![]()
more progress, but I have a question .
Ive made some solid lines out of stainless tube to fit to the main boom, just sitting on there temporarily , but before I cut the plastic lines . How do you guys seal the fittings on. Ive tapped them at 5mm which is the correct size for my fittings , I will change the bottom fittings for right angle fittings, but do you use any sort of tread lock or sealant. ![]() ![]() I have made some access panels to cover the ugly air vents, and will run a fan at the top of the engine cover to take hot air away. ![]() cheers andy |
Currently Active Users Viewing This Thread: 1 (0 members and 1 guests) | |
|
|