RC Truck and Construction  

Go Back   RC Truck and Construction > RC Truck's Ag and Industrial Equipment and Buildings > Construction Equipment > Construction Companies & Worksites


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 01-28-2017, 02:34 PM
Lil Giants's Avatar
Lil Giants Lil Giants is offline
BANNED
 
Join Date: Aug 2010
Location: Saskatchewan
Posts: 4,431
Lil Giants has disabled reputation
Default Re: LilGiantsConstrCo

Finished the dirt ramp a few wks ago, this all I have left to dig out for the walkway, 3 x 3 x 2.... less than a cy. Where you see the trench line leaves 24" for the last two stairs that I'll hand dig to the correct dimensions. Then stick my diesel blast heater down there for a week or two to dry out the tunnel walls & stairs cement hard.



These couple pics was last weekend.





And then this morning's 3 lipos worth of rip - dig & pull it back to where the 850 is able to swing 180.











Another 20 trk loads ready to haul out



The last of the tunnel dig will be to cut the hump out of the entry to make it about a 14 degree decent, I'll still have to duck myself to walk through.

__________________
Sharing knowledge is one thing that defies basic arithmetic logic --- the more you share, the more you get!

Joe
Reply With Quote
 


Currently Active Users Viewing This Thread: 8 (0 members and 8 guests)
 

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 04:02 PM.


Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.