RC Truck and Construction  

Go Back   RC Truck and Construction > RC Truck's Ag and Industrial Equipment and Buildings > Construction Equipment > Construction Companies & Worksites


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 02-03-2017, 09:20 PM
Mustang46555 Mustang46555 is offline
Wannabe
 
Join Date: Sep 2013
Location: North Webster, IN
Posts: 305
Mustang46555 is on a distinguished road
Default Re: Great Dane excavating co.

Best way to remember feeds and speeds is surface footage controls your RPM's (based on material being cut) then you can vary your feed to get the chip load you want, usually figured in amount per tooth. Is your CAM software programing in feed per minute or feed per revolution? Very nice finish on the parts shown, looks like you're off to a good start. Don't feel bad about going slow on your first cut with a new program. I've been doing CNC for over 20 yrs and the first part off always takes extra time. Your mill will appreciate the extra care too!
Reply With Quote
 


Currently Active Users Viewing This Thread: 20 (0 members and 20 guests)
 

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 05:34 PM.


Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.