RC Truck and Construction  

Go Back   RC Truck and Construction > RC Truck's Ag and Industrial Equipment and Buildings > Construction Equipment > Construction Companies & Worksites


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 11-08-2017, 12:34 AM
skeeter skeeter is offline
Big Dawg On The Bone
 
Join Date: Jul 2017
Location: Washington State
Posts: 1,735
skeeter is on a distinguished road
Default Re: Skeeters contracting services

Being unable to locally source anything larger then 1/2" heat shrink tubing, I had to order the 1.5" heatshrink tubing from evilbay. It was awaiting my arrival when I got home from work today, so I put it to good use. The 600MAH NMH battery pack for the Bruder D5 conversion has been finished. I made 2 of them, as they ONLY last about 8-10 minutes, from the time they are turned on, to the time they are dead. since the battery life is such short lived, I've decided to forego the on board charging system, & the battery will need removed/swapped when it dies.
One of the 2 COMPLETED battery packs.
unnamed (38) by Anthony Kalnoski, on Flickr

I smoked 2 batteries while trying to figure this out. I had BOTH + & the - terminals on them bused together. I was wondering why the batteries were getting so warm, & they sparked each time I touched the buss bar. Now I know!
Reply With Quote
 


Currently Active Users Viewing This Thread: 23 (0 members and 23 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 10:27 PM.


Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.