![]() |
|
Construction Equipment If it digs, pushes, hauls dirt "off road" post it here. |
|
Thread Tools | Display Modes |
#10
|
||||
|
||||
![]()
thanks Dan , both sides . The initial op (1 side ) was 8 hrs on the flip over just shy of 3 hrs to mill between the flanges . I have about 24 hrs with a set of trailer frames and the 2nd mack frame and the walking beams . All out of 1 piece of plate .
__________________
RIP FreddyGearDrive 2-12-59/12-19-11 To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts. |
Currently Active Users Viewing This Thread: 1 (0 members and 1 guests) | |
Thread Tools | |
Display Modes | |
|
|