RC Truck and Construction  

Go Back   RC Truck and Construction > RC Truck's Ag and Industrial Equipment and Buildings > Construction Equipment

Construction Equipment If it digs, pushes, hauls dirt "off road" post it here.


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 04-23-2012, 05:36 PM
ihbuilder's Avatar
ihbuilder ihbuilder is offline
Fabrication and design , super moderator
 
Join Date: Aug 2010
Location: in a cage in Auburn,PA
Posts: 3,557
ihbuilder is a jewel in the roughihbuilder is a jewel in the roughihbuilder is a jewel in the roughihbuilder is a jewel in the rough
Default Re: dresser TD40B dozer

had these parts drawn and ready for cuttin for a couple months Well after seeing Ari's excavator tracks , I just had to mill a few pieces in aluminum just to see if all will werk according to plan So far so good with a few lil tweeks before I load a piece of .25" plate in the mill push green button and go to bed ( well , not that easy ) In steel , it werks out to be about 84hrs to get a complete set of tracks For those that are wondering why the big hole on 1 side of the like , it gets a bushing . I'm making these like a real set . I just need to make a scale track press oh and a tapping head for the mill









thanks for looking
__________________
RIP FreddyGearDrive 2-12-59/12-19-11

To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.
Reply With Quote
 


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 04:23 PM.


Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.