RC Truck and Construction  

Go Back   RC Truck and Construction > RC Truck's Ag and Industrial Equipment and Buildings > Construction Equipment > Construction Companies & Worksites


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 10-11-2017, 05:22 PM
frizzen's Avatar
frizzen frizzen is offline
Big Dawg On The Bone
 
Join Date: Jan 2016
Location: indy, indiana
Posts: 2,002
frizzen is on a distinguished road
Default Re: Skeeters contracting services

Smallhaul ha several dozer or bobcat builds that replaced the standard hs645 with the digital version of it since they have a faster transit time, maybe look into those specs for the size you run? Check the channel endpoints, you might not be giving the motor control full range/speed. You might also have a dual rate setting turned on in the tx.

No, that drawing will let smoke out.

All the grounds can just be tied together. Put esc + on a side, put battery + on center, put charge + on a side.

I'm not sure if you're using a 2 or 3 pos switch. You want center off if you have it. One throw connect charge to battery, other throw connect esc to battery.

Li-on isn't used much in rc. Its safer than lipo. You don't generally have much of a C rating, the chargers are kinda weird, and a lot of them have a circuit that bricks the battery after x time or cycles. Hopefully someone knows more about them than me.
__________________
What do ya mean "Cars are neither Trucks or Construction"?
It's still scale, and i play fairly well with others, most of the time...
Reply With Quote
 


Currently Active Users Viewing This Thread: 2 (0 members and 2 guests)
 

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 12:49 PM.


Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.