Been working very slow lately. Thought I'd post a couple from this week.
Setting up boom to mill the chords to proper length
Now I need to make plates and attach to the ends so the channel that holds the front pillow block on can be mounted.
That wood block I used temporally for the point sheave came in handy to hold everything in alignment.
I miscounted the quantity of 1.25'' sheaves needed. I still need about 5 more and 4- 1''dia.
This is the first side then I will flip them over locate to one of the holes and continue milling the pockets.