![]()  | 
	
		
			
  | 
	|||||||
| Construction Equipment If it digs, pushes, hauls dirt "off road" post it here. | 
| 
		 | 
	Thread Tools | Display Modes | 
| 
		 
			 
			#11  
			
			
			
			
			
		 
		
	 | 
|||
		
		
  | 
|||
| 
		
	
		
		
			
			 
			
			I made a test piece out of laminated styrene to replace the stock link that curls the bucket. I know it looks horrible, hopefully my final one is out of aluminium and will look a lot better. 
		
		
		
		
		
		
			  I lengthened it twice because my measurements were way off, eyeballing it didn't work![]() ![]() Ok, the stock distance from hole to hole is 62.9mm. The new one is longer and the distance from hole to hole is 66.5mm. This is the stock link. ![]() Here is the modified link, camera wasn't moved. I didn't check the focus that's why its blurry and looks like the camera was moved. ![]() Modified link again. Bucket curl maxed out, hitting the arms. ![]() Stock link at a little less than maximum lift. ![]() Modified link. ![]() I forgot to take this picture with the modified link installed, but to get this range of motion I took out the glued on spacer around the curl piston rod that limits how much the piston can extend. ![]() Here's a picture of the spacer. It is 15.1mm long. ![]() Tracking says I should get the Orings on Monday, so hopefully I will have a video by then to show the new range of motion and/or any catastrophic failure  
		
				__________________ 
		
		
		
		
		
	
	Youtube username iamaman27  | 
| Currently Active Users Viewing This Thread: 1 (0 members and 1 guests) | |
		
  | 
	
		
  |