RC Truck and Construction  

Go Back   RC Truck and Construction > RC Truck's Ag and Industrial Equipment and Buildings > Construction Equipment

Construction Equipment If it digs, pushes, hauls dirt "off road" post it here.


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 07-16-2017, 12:07 AM
Highover Highover is offline
Newbie
 
Join Date: Jul 2017
Location: Chanhassen, Minnesota
Posts: 13
Highover is on a distinguished road
Default Bruder Conveyor Brass Rebuild

So while I wait till later this year to buy a excavator I have decided to build a conveyor belt to move dirt around. I started with a Bruder conveyor belt that I looked at for about five minutes, then proceed to destroy it and salvage the rollers and belt from it.

Next step was buying 3/16 ( 0.1875 ) brass tubing from the hobby shop for the new frame, 1" x 1/16" ( 0.0625 ) brass strip for bearing plates, and some sheet metal for a hopper.

I then set up my Bridgeport mill to mill four 21" tubes to length for the main rail of the new frame, and also to cut/notch the ends of all the tubes that would be used as spacers for the height and width of the frame.

Here are some pictures of the set-up and final product of my work.



I used a scrap of the tubing against a vise stop to ensure that both notches were parallel with each other. To make the notches I used a 0.1875 endmill ( EM ) to drill a hole down the center of the tube and offset from my stop the length of the spacer I wanted.





In all I had 4 - 21.00" main rails, 20 - 1.00" spacers, 11 - 2.125" spacers.

I spent my afternoon this weekend ( 7/15/17 ) soldering all the part together to make the two sides of the frame and also milled my 0.0625 bar stock to size to fit between my 1" spacers. I also made a spacer block to get a very consistent spacing of 2.375" between each tube center to center and also to keep them square to the frame rails.

Here are some picture of the frame as I assembled it.





Here are pictures of the finished sides with the bearing plates.





Here I am soldering in the bearing plates, I used a piece of my 0.0625 brass stock to get the plates centered in the frames.



The finished product.



My next steps will be to add in my 2.125" spacers and drill and bore the bearing plates to fit my flange bearings I bought as well to drill the clearance holes to allow me to bolt the gear motor on. I bought all my motion components from www.servocity.com, time will tell if these components hold up. the motor is a 195 RPM motor.







So this is my update for now, It will be a week or two before I get around to boring the holes for the bearings.

-Joe

Last edited by Highover; 07-16-2017 at 12:13 AM.
Reply With Quote
 

Tags
bruder, convyor, highover, minnesota


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 07:27 PM.


Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.