![]() |
|
Construction Equipment If it digs, pushes, hauls dirt "off road" post it here. |
![]() |
|
Thread Tools | Display Modes |
|
#1
|
||||
|
||||
![]() Quote:
![]() |
#2
|
||||
|
||||
![]()
Well, I finally got the tip soldered together. Another milestone crossed. I counted 135pcs that were made for this section of boom excluding about 150 bolts. I hope to get on the safety rope mountings soon. There's also a set of deflection sheaves that help guide the hoist rope I talked about before that are made but I need to design the channels that they mount to.
End Plates ![]() Underside ![]() Inside of the rear pillow block ![]() Soldered ![]() Last of the lattice that needed installed ![]() Top section ![]() |
![]() |
Currently Active Users Viewing This Thread: 3 (0 members and 3 guests) | |
|
|