![]() |
|
#1
|
||||
|
||||
![]()
So this is what I've been digging lately, under the west porch.. it was kind of a ski slope from the back wall to the water heater. Cutting it down flat, square up the edges, make it a better storage area for wet dirt from other areas in the basement. Took about 12" cut at the face of the wall & it's about 8" at front of cut.
![]() ![]() ![]() ![]() ![]() Hauling the wet dirt over here to the sw corner, will eventually employ bucket screener here & haul the wet lumps back to where I'm digging now, to leave to dry out over summer, then crush it next winter & pile and haul it out summer of '14. ![]() ![]() ![]() This cut is 18" deep by 72"x32" (0.917 cu yd), that's most of the dirt already in this corner. ![]() ![]() There's maybe a dozen bellydump loads to screen & crush here presently, the last of the bone dry dirt from the wall mined away last winter. ![]() Haul quite a bit of this crush over to the wet pile sw corner, give the 850 a dry, elevated platform to perch from while screening. And put the remainder in the wall for backfill. ![]() ![]() Started the slow soak again this morning under the west porch, take about a week for thorough deep coverage, then let the surface dry for about 3 or 4 days & dig some more...starting at 8" at the last cut, tapering down to an inch depth just behind the water heater. ![]() ![]() ![]() Here's a movie, can't see the 850 hardly b/c of poor lighting, but I think you can still make out how tight of area it is for it to work within. ![]() http://youtu.be/WwrxdVTLfmY
__________________
Sharing knowledge is one thing that defies basic arithmetic logic --- the more you share, the more you get! Joe |
![]() |
Currently Active Users Viewing This Thread: 36 (0 members and 36 guests) | |
|
|