![]()  | 
	
		
			
  | 
	|||||||
| Construction Equipment If it digs, pushes, hauls dirt "off road" post it here. | 
![]()  | 
	
	
| 
		 | 
	Thread Tools | Display Modes | 
| 
	 | 
| 
		 
			 
			#1  
			
			
			
			
			
		 
		
	 | 
|||
		
		
  | 
|||
| 
		
	
		
		
			
			 
			
			Next I had to improve the pipe holder for the bucket cylinder. I desoldered the brass holder and used a piece of steel. Screws also in M1.6, using a 1.3mm Drill (~ 50 thou) in the brass pieces. 
		
		
		
			Pipeclamps, waterjet cut, then separated and drilled with a drill jig And the whole assembly  | 
![]()  | 
	
	
| Currently Active Users Viewing This Thread: 8 (0 members and 8 guests) | |
		
  | 
	
		
  |