![]()  | 
	
		
			
  | 
	|||||||
| Construction Equipment If it digs, pushes, hauls dirt "off road" post it here. | 
![]()  | 
	
	
| 
		 | 
	Thread Tools | Display Modes | 
| 
	 | 
| 
		 
			 
			#1  
			
			
			
			
			
		 
		
	 | 
|||
		
		
  | 
|||
| 
		
	
		
		
			
			 
			
			thank you, zabco.  
		
		
		
		
		
		
			---- The cabin gets a bit more interieur and a fire extinguisher. All windows are in and the cabin is installed on the under construction. ![]() ![]() ![]() The complete ensemble is dismountable in seconds to reach on the ballast sections. ![]() The cabin is done  
		
				__________________ 
		
		
		
		
		
	
	Regards Ralf  | 
| 
		 
			 
			#2  
			
			
			
			
			
		 
		
	 | 
|||
		
		
  | 
|||
| 
		
	
		
		
			
			 
			
			I really am amazed at how quickly you complete all this fabrication! Very nice!
		 
		
		
		
		
		
		
		
		
	
	 | 
| 
		 
			 
			#3  
			
			
			
			
			
		 
		
	 | 
|||
		
		
  | 
|||
| 
		
	
		
		
			
			 
			
			Thank you.  
		
		
		
		
		
		
			Fast? This build is running since eight Months. But the end is nigh ![]() The Cabin is done and the work on the Hull has started. Unfortunately I'm not able to "metal shaping" with a shrinker/stretcher/english wheel in a proper way. So I've decided to make the back not really round but in five parts. ![]() After two hull panels (the back and the small part behing the cabin) I've mocked up all the parts to check the proportions. I like it so far ![]() ![]() ![]()  
		
				__________________ 
		
		
		
		
		
	
	Regards Ralf  | 
| 
		 
			 
			#4  
			
			
			
			
			
		 
		
	 | 
|||
		
		
  | 
|||
| 
		
	
		
		
			
			 
			
			The superstructure and the undercarriage are now connected.  
		
		
		
		
		
		
			The electro block has moved from vertical ![]() to horizontal ![]() to get room for ballast, if i need some  
		
				__________________ 
		
		
		
		
		
	
	Regards Ralf  | 
![]()  | 
	
	
| Currently Active Users Viewing This Thread: 8 (0 members and 8 guests) | |
		
  | 
	
		
  |