![]() |
|
|||||||
| General Discussion A place to post off topic discussions. |
![]() |
|
|
Thread Tools | Display Modes |
|
|
|
#1
|
|||
|
|||
|
my design for a track system for the Hitachi 3600-6 to look similar but not exact. yeah they are 3 1/18" wide!
the 1:1 has 38 on each side... i was thinking of using a dead treadmills belt. the 2 smaller bolts attach the 1 1/2" tube (sliced down the middle w/corners rounded using grinder) to the belt. the third one also does this but is longer for grabbing the drive wheel.* not all measurements are exact, still need to find belt so those are off, as well as the length of bolts. those there are 4mm x 11m and 4mm x 25mm let me know what you all think of THIS idea. dont forget about post #1 though Last edited by edwalsh18; 04-29-2011 at 07:58 PM. |
|
#2
|
||||
|
||||
|
Hi,
Here a link to a video of a working real Menck: http://www.myvideo.de/watch/1713660/..._mit_Menck_M40 and here another video of a working scale model: http://www.youtube.com/watch?v=mpRKN...eature=related Hope this helps. Cheers, Markus |
|
#3
|
|||
|
|||
|
Quote:
would like to know some more info on the cable setups. how they work, what pulleys do what, how the operator controls it, etc. as well as some more pics/videos |
|
#4
|
|||
|
|||
|
heres a pic of where i am so far, not much progress. this is somewhat of what the tracks will look like. i need to space the shoes out 1/4" and i am thinking of using 1" x 3 1/8" shoes as opposed to 1 1/2" x 3 1/8" to get the look but only if the spacing is enough for the drive wheel and wont create binding.
|
![]() |
| Currently Active Users Viewing This Thread: 1 (0 members and 1 guests) | |
|
|